Sprint Review (product-owner): verified all 5 committed stories against
acceptance criteria (goal met, two tracked caveats), updated the backlog
with verification notes and two new follow-up stories, and flagged a
process-improvement item.
Sprint Retrospective (scrum-master): named team-level strengths to keep
(dependency-ordered batch swarming; leave-it-better-than-you-found-it
and honest gap reporting), checked for anti-patterns (none found beyond
one named near-miss), and proposed a Definition of Done edit requiring
verification against the actual built artifact for any story that
changes launch/packaging/config-resolution behavior — directly
addressing how the license-key bug reached "Done" undetected.
User approved the proposed edit; applied to
templates/definition_of_done.md and marked Applied in
logs/process_improvement_log.md.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Implements the remaining committed Sprint 1 stories (Batches 3-5):
- CLI emits line-oriented PROGRESS events (startup/render/complete/failure)
on stdout, throttled to >=1/sec, alongside the existing stderr/exit-code
contract.
- New EnvelopeRenderer.Desktop WinForms app lets an operator pick template/
CSV/output paths and launch a render without blocking the UI.
- Desktop app streams and parses the CLI's progress events live, shows
active status, and displays a completion summary with elapsed time and
totals.
Verified end-to-end against the real 392-row sample CSV (real success and
real forced-failure runs); 106/106 tests passing. Sprint 1's goal is met
and its backlog is fully Done; state.md and backlog/sprints/sprint-1.md
are updated to hand off to Sprint Review.