# Project State > The single live "where are we right now" file. Read this FIRST at the start of any session that touches this repo - don't infer phase or sprint from conversation history. Updated LAST by whichever agent completes the current step, as documented in `AGENTS.md` under "Automated State-Driven Handoff." **Phase:** 4 - Sprint review **Leading agent:** `product-owner` **Process file:** `process/04_sprint_review.md` **Sprint:** 1 **Sprint dates:** 2026-09-08 - 2026-09-11 **Sprint goal:** Prove a thin text-only desktop-to-CLI rendering spine so an operator can select files, launch a job, watch progress, and receive a PDF generated through Debenu from a known XML template. **Current sprint backlog:** `backlog/sprints/sprint-1.md` **Next action:** All 5 committed Sprint 1 items are Done (exit criteria for Phase 3 met — see `backlog/sprints/sprint-1.md`). The walking skeleton is real end-to-end: an operator picks template/CSV/output paths in the WinForms desktop app (`EnvelopeRenderer.Desktop`), launches a render without freezing the UI, watches live progress parsed from the CLI's `PROGRESS ...` stdout stream, and gets a completion summary. Post-Sprint-Review-handoff, the user hit a real bug using the desktop app directly (Debenu error 999): the CLI only read `DEBENU_LICENSE_KEY` from the process environment, which a double-clicked desktop app never has — fixed same-day with `DebenuLicenseKeyResolver` (env var, then a `key.txt` walked up from the executable's own directory), logged in `logs/technical_debt_log.md`, verified against the actual built `.exe` (exit 0, valid 392-page PDF). 111 tests passing. `product-owner` runs Sprint Review next per `process/04_sprint_review.md`. Carry-forward items to raise at review: template-path and UNC-timeout impediments still open (`logs/impediment_log.md`); the 100k-record/300 DPI benchmark hasn't been re-run since Batch 2; no "warning" concept exists in the product yet, so the "warning count" acceptance task for the last story was satisfied by its documented absence rather than a real counter; and the license-key gap above is a signal that Sprint 2 should verify GUI stories against the actual built artifact, not just an in-process harness. ## Phase reference | # | Phase | Leading agent | Process file | |---|---|---|---| | 0 | Project onboarding | `product-owner` + `scrum-master` | `process/00_project_onboarding.md` | | 1 | Backlog refinement | `product-owner` (+ `dev-team` sizing) | `process/01_backlog_refinement.md` | | 2 | Sprint planning | `scrum-master` facilitates | `process/02_sprint_planning.md` | | 3 | Sprint execution | `dev-team` (+ `scrum-master` daily scrum) | `process/03_sprint_execution.md` | | 4 | Sprint review | `product-owner` leads | `process/04_sprint_review.md` | | 5 | Sprint retrospective | `scrum-master` leads | `process/05_sprint_retrospective.md` | | - | Technical debt (continuous) | `qa-tech-debt` | `process/06_technical_debt_management.md` | | - | Portfolio/release planning (as needed) | `release-planner` | `AGENTS.md` - Multilevel Planning | | - | Process self-improvement (end of every retro) | `scrum-master` | `process/07_process_improvement.md` | After phase 5, loop back to phase 1 for the next sprint. ## History | Date | Phase completed | Notes | |---|---|---| | 2026-09-04 | 0 - Project onboarding | Seeded project config, Definition of Done, initial epic backlog, and open questions from `Envelope_Report_Generator_Requirements.md`. | | 2026-09-04 | 1 - Backlog refinement | Refined the top epics into sprint-ready stories, confirmed `C#/.NET 10` as the application stack, and reordered the backlog for the first text-only MVP slice. | | 2026-09-04 | 2 - Sprint planning | Created Sprint 1 around a conservative desktop-to-CLI text-only rendering spine and recorded the committed backlog in `backlog/sprints/sprint-1.md`. | | 2026-09-08 | 3 - Sprint execution (in progress) | Held Daily Scrum #1 and turned the sprint backlog into a dependency-ordered execution plan (5 batches) in `backlog/sprints/sprint-1.md`. Still in phase 3 — not a phase transition, just the day's checkpoint. | | 2026-09-08 | 3 - Sprint execution | All 5 batches Done: CLI render contract, real Debenu text-only rendering, stdout progress events, WinForms desktop launch shell (user-confirmed as the UI framework), and live progress/completion display. 106 tests passing end-to-end. Sprint goal met with real verified runs against the 392-row sample CSV. |