25개 이상의 토픽을 선택하실 수 없습니다. Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.

4.0KB

Project State

The single live “where are we right now” file. Read this FIRST at the start of any session that touches this repo - don't infer phase or sprint from conversation history. Updated LAST by whichever agent completes the current step, as documented in AGENTS.md under “Automated State-Driven Handoff.”

Phase: 4 - Sprint review Leading agent: product-owner Process file: process/04_sprint_review.md

Sprint: 1 Sprint dates: 2026-09-08 - 2026-09-11 Sprint goal: Prove a thin text-only desktop-to-CLI rendering spine so an operator can select files, launch a job, watch progress, and receive a PDF generated through Debenu from a known XML template. Current sprint backlog: backlog/sprints/sprint-1.md

Next action: All 5 committed Sprint 1 items are Done (exit criteria for Phase 3 met — see backlog/sprints/sprint-1.md). The walking skeleton is real end-to-end: an operator picks template/CSV/output paths in the WinForms desktop app (EnvelopeRenderer.Desktop), launches a render without freezing the UI, watches live progress parsed from the CLI's PROGRESS <kind> ... stdout stream, and gets a completion summary — verified with a real success run (392/392 pages, valid PDF) and a real forced-failure run against the actual sample CSV. 106 tests passing. product-owner runs Sprint Review next per process/04_sprint_review.md. Carry-forward items to raise at review: template-path and UNC-timeout impediments still open (logs/impediment_log.md); the 100k-record/300 DPI benchmark hasn't been re-run since Batch 2; no “warning” concept exists in the product yet, so the “warning count” acceptance task for the last story was satisfied by its documented absence rather than a real counter — product owner may want to scope that once image/overflow handling exists.

Phase reference

# Phase Leading agent Process file
0 Project onboarding product-owner + scrum-master process/00_project_onboarding.md
1 Backlog refinement product-owner (+ dev-team sizing) process/01_backlog_refinement.md
2 Sprint planning scrum-master facilitates process/02_sprint_planning.md
3 Sprint execution dev-team (+ scrum-master daily scrum) process/03_sprint_execution.md
4 Sprint review product-owner leads process/04_sprint_review.md
5 Sprint retrospective scrum-master leads process/05_sprint_retrospective.md
- Technical debt (continuous) qa-tech-debt process/06_technical_debt_management.md
- Portfolio/release planning (as needed) release-planner AGENTS.md - Multilevel Planning
- Process self-improvement (end of every retro) scrum-master process/07_process_improvement.md

After phase 5, loop back to phase 1 for the next sprint.

History

Date Phase completed Notes
2026-09-04 0 - Project onboarding Seeded project config, Definition of Done, initial epic backlog, and open questions from Envelope_Report_Generator_Requirements.md.
2026-09-04 1 - Backlog refinement Refined the top epics into sprint-ready stories, confirmed C#/.NET 10 as the application stack, and reordered the backlog for the first text-only MVP slice.
2026-09-04 2 - Sprint planning Created Sprint 1 around a conservative desktop-to-CLI text-only rendering spine and recorded the committed backlog in backlog/sprints/sprint-1.md.
2026-09-08 3 - Sprint execution (in progress) Held Daily Scrum #1 and turned the sprint backlog into a dependency-ordered execution plan (5 batches) in backlog/sprints/sprint-1.md. Still in phase 3 — not a phase transition, just the day's checkpoint.
2026-09-08 3 - Sprint execution All 5 batches Done: CLI render contract, real Debenu text-only rendering, stdout progress events, WinForms desktop launch shell (user-confirmed as the UI framework), and live progress/completion display. 106 tests passing end-to-end. Sprint goal met with real verified runs against the 392-row sample CSV.

Powered by TurnKey Linux.