Project State

The single live “where are we right now” file. Read this FIRST at the start of any session that touches this repo - don't infer phase or sprint from conversation history. Updated LAST by whichever agent completes the current step, as documented in AGENTS.md under “Automated State-Driven Handoff.”

Phase: 3 - Sprint execution Leading agent: dev-team Process file: process/03_sprint_execution.md

Sprint: 8 planned (2026-10-26), not yet executed. Sprint goal: Ship whole-Address-Control rotation end-to-end - settable via the properties panel and adjustable by dragging a canvas handle - staying record-stable and visually consistent across the editing canvas, the Sprint 7 live preview, and the real CLI-rendered PDF, directly delivering the human product owner's reversal of the Sprint 6 Review “out of scope” call. Current sprint backlog: backlog/sprints/sprint-8.md

Next action: Natural post-retrospective pause. When the user says to continue, start Sprint 8 backlog refinement as product-owner, folding in the Sprint 7 retrospective's three carried-forward action items: (1) apply the built-form-vs-canvas-only smoke rule per-story for epic 6's multi-select/align pair, since aligning/distributing may add new toolbar affordances requiring a full smoke; (2) when a later batch adds a control to a form an earlier batch already screenshotted, capture a fresh full-form screenshot rather than reusing the earlier one; (3) if a future PO sprint review again lacks shell/build access, disclose it and arrange an independent cross-check (as was done this sprint). No kit-level edit was made - the one new process signal (PO review lacking shell/build access this sprint) was logged as a “Watching” item in logs/process_improvement_log.md, judged a first-occurrence tooling-access gap distinct from the closed Sprint 3 PO-independence item, not severe enough to change AGENTS.md/process//templates/. Also still open: the “Warn on text overflow before render” (epic 4) product question, not blocking, for whenever the human product owner wants to resolve it.

Since the retrospective, same-day user feedback on the live Sprint 7 build (2026-10-19), handled outside formal ceremony:

  • Two post-review fixes already implemented, tested, and live-verified (not new sprint work - corrections to Sprint 7's own just-shipped increment): (1) record-number navigation now auto-updates the preview with no “Go” button; (2) the editing canvas now rotates static and dynamic/mixed text elements identically (smooth center-pivot), while the real render and the Sprint 7 preview panel keep the record-stable anchor-pivot behavior from the Oct 9 defect fix unchanged. Both documented in backlog/sprints/sprint-7.md's “Post-review fixes” section, backlog/epics/02_template_designer_gui_foundation.md, and logs/technical_debt_log.md. Test suite now 402/402 (up from 400), independently confirmed via a real dotnet test run.
  • New backlog item queued for Sprint 8 (user explicitly chose to queue rather than implement ad hoc): epic 8 (Composite Address Controls, reopened from Done) gained two new Ready, sized stories - “Rotate the whole Address Control as a single unit” (8 pts) and “Rotate the whole Address Control by dragging a handle on the canvas” (5 pts, depends on the former) - 13 points total. Confirmed by code inspection that Address Control's box geometry is author-set (not measured from resolved text), so whole-control rotation can safely pivot around the box center everywhere (editing canvas, preview, and real render) with no anchor-pivot workaround needed, unlike the standalone-element defect fix. Full detail in backlog/epics/08_composite_address_controls.md and backlog/backlog.md's new dated note.

Next action: Execute Sprint 8 as dev-team (13 points committed, dependency-ordered per backlog/sprints/sprint-8.md): Batch 1 “Rotate the whole Address Control as a single unit” (8 pts, no dependency - angle property, persistence, box-center pivot math across canvas/preview/render), Batch 2 “Rotate the whole Address Control by dragging a handle on the canvas” (5 pts, depends on Batch 1). scrum-master deliberately kept this an under-commit (13 pts vs. the proven 18-20 range) rather than pairing with epic 6's multi-select/align pair (would total 23, a new high): both this sprint's drag-handle story and multi-select would land foundational, first-of-its-kind changes in the same small set of GUI files (CanvasElementEditor, TemplateCanvasControl), and this team consistently keeps that class of risk isolated. Honor the Sprint 7 retro carry-ins: built-form smoke for any GUI story touching form layout/properties/toolbar actions; a FRESH full-form screenshot per batch if a later batch changes a form an earlier batch already screenshotted (not a reused one - the exact Sprint 7 near-miss). Still-open, non-blocking: “Warn on text overflow before render” (epic 4) product question; both epic 7 impediments (asset path strategy, UNC timeout/retry, open since 2026-09-04); epic 6's multi-select/align pair (10 pts) and “Undo and redo layout changes” (13 pts, feasibility de-risked) remain Ready for Sprint 9; “Complete the first text-only operator workflow” (epic 1, 5 pts) is labeled Ready but flagged by scrum-master as a stale onboarding-era placeholder needing re-verification before ever being pulled, same staleness pattern epic 4 had at the 2026-10-16 refinement.

Phase reference

# Phase Leading agent Process file
0 Project onboarding product-owner + scrum-master process/00_project_onboarding.md
1 Backlog refinement product-owner (+ dev-team sizing) process/01_backlog_refinement.md
2 Sprint planning scrum-master facilitates process/02_sprint_planning.md
3 Sprint execution dev-team (+ scrum-master daily scrum) process/03_sprint_execution.md
4 Sprint review product-owner leads process/04_sprint_review.md
5 Sprint retrospective scrum-master leads process/05_sprint_retrospective.md
- Technical debt (continuous) qa-tech-debt process/06_technical_debt_management.md
- Portfolio/release planning (as needed) release-planner AGENTS.md - Multilevel Planning
- Process self-improvement (end of every retro) scrum-master process/07_process_improvement.md

After phase 5, loop back to phase 1 for the next sprint.

History

Date Phase completed Notes
2026-09-04 0 - Project onboarding Seeded project config, Definition of Done, initial epic backlog, and open questions from Envelope_Report_Generator_Requirements.md.
2026-09-04 1 - Backlog refinement Refined the top epics into sprint-ready stories, confirmed C#/.NET 10 as the application stack, and reordered the backlog for the first text-only MVP slice.
2026-09-04 2 - Sprint planning Created Sprint 1 around a conservative desktop-to-CLI text-only rendering spine and recorded the committed backlog in backlog/sprints/sprint-1.md.
2026-09-08 3 - Sprint execution (in progress) Held Daily Scrum #1 and turned the sprint backlog into a dependency-ordered execution plan (5 batches) in backlog/sprints/sprint-1.md. Still in phase 3 — not a phase transition, just the day's checkpoint.
2026-09-08 3 - Sprint execution All 5 batches Done: CLI render contract, real Debenu text-only rendering, stdout progress events, WinForms desktop launch shell (user-confirmed as the UI framework), and live progress/completion display. 106 tests passing end-to-end. Sprint goal met with real verified runs against the 392-row sample CSV.
2026-09-11 4 - Sprint review product-owner verified all 5 stories against acceptance criteria (verdict: sprint goal met, with two tracked caveats — see backlog/sprints/sprint-1.md's Sprint Review Outcome section). Updated backlog/backlog.md and epics 01/05/07 with Done notes and two new follow-up stories. Logged one process-improvement item (Watching) for the retrospective re: verifying GUI stories against the actual built artifact, not just an in-process harness — this is exactly what let the license-key bug (fixed same-day, see logs/technical_debt_log.md) through undetected.
2026-09-11 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-1-retrospective.md). Named two team-level strengths to keep (dependency-ordered batch swarming; “leave it better than you found it” plus honest gap self-reporting) and one lower-priority deferred idea (re-trigger the 100k-record benchmark when hot-path code changes). Decided the DoD/verification-gap item meets the bar for a proposed kit edit (single severe occurrence) and drafted specific wording for templates/definition_of_done.md. User approved the edit same-day; it was applied to the template (confirmed in logs/process_improvement_log.md, Status: Applied) — state.md briefly and incorrectly described this as still pending in a later note, corrected on 2026-09-14. Checked all four named anti-patterns; none found (one near-miss on thin GUI evidence named explicitly, addressed via the DoD edit and a Sprint 2 action item rather than swept aside).
2026-09-14 2 - Sprint planning scrum-master facilitated Sprint 2 planning with product-owner and dev-team. Committed 19 points: the overdue high-volume benchmark spike (pulled first per the retrospective action item) plus the full Template Designer GUI Foundation epic as one coherent vertical slice (canvas dimensions -> text placement -> properties panel -> save/reopen). CSV Integration stories deferred whole to Sprint 3 (3 of 4 hard-depend on this sprint's text-placement story); “Load CSV headers” kept as an explicit stretch item since it has no such dependency. Capacity treated as low-confidence off one data point (Sprint 1's 20 completed points). Recorded in backlog/sprints/sprint-2.md.
2026-09-14 3 - Sprint execution dev-team completed all 5 committed batches in dependency order (one interruption/resume mid-run due to a session rate limit, no work lost). Batch 1 (benchmark spike) found a material, previously-unknown risk: real-world throughput degrades from ~399 rec/s to ~15 rec/s and falling at ~100k-record scale, missing the 10-minute target by 5x-10x+, isolated to Debenu Quick PDF Library 10.13's document model — logged as a new Ready story plus a High-impact tech debt entry rather than fixed in-scope. Batches 2-5 delivered the full Template Designer GUI Foundation epic (canvas dimensions, text placement, properties panel, save/reopen), each verified live against the actual built .exe per the Sprint 1 retrospective's DoD edit. 195/195 tests passing. Stretch item not pulled (full committed slice prioritized over starting more scope).
2026-09-18 4 - Sprint review product-owner verified all 5 Sprint 2 stories against acceptance criteria (verdict: sprint goal met). Updated backlog/backlog.md and epics 02/05 with Done notes and verification detail; confirmed and endorsed dev-team's benchmark self-verification, framing it as a successful spike (story ACs met) surfacing a failing product metric (target missed), not a failed story. Recommended prioritizing the new throughput-investigation story at or near the top of Sprint 3.
2026-09-18 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-2-retrospective.md). Confirmed full follow-through on all four Sprint 1 retro action items (clean sprint, no drops) — notably, the Sprint 1-named “thin GUI evidence” weakness was concretely fixed this sprint via live actual-.exe verification on every GUI story. No kit-level edit proposed (one low-severity, single-occurrence daily-log arithmetic slip found; below the bar for a kit change, logged as a deferred watch item). Checked all four named anti-patterns plus the Sprint 1 status-theater near-miss; none found, with the status-theater near-miss specifically improved on rather than repeated.
2026-09-21 2 - Sprint planning scrum-master facilitated Sprint 3 planning with dev-team sizing support. Sized the previously-unsized “Investigate and address high-volume render throughput degradation” story at 8 points (bounded by its own time-boxed acceptance criteria plus a code-inspection-backed feasibility check, recorded in backlog/epics/05_cli_rendering_engine_and_debenu_integration.md). Committed 18 points (throughput story first, then the CSV Integration chain in backlog order) against a 19-20 point velocity range, deliberately leaving “Collapse blank optional address lines” and “Harden production configuration delivery” uncommitted for capacity discipline. Recorded in backlog/sprints/sprint-3.md.
2026-09-21 to 2026-09-22 3 - Sprint execution dev-team completed all 4 committed batches in dependency order across 2 daily-scrum entries. Batch 1 (throughput investigation, 8 points): confirmed the Debenu-internal-document-model hypothesis via a scaled-down real-DLL probe, implemented a batch+merge mitigation in DebenuPdfRenderer, and re-ran the full 100k-record benchmark to completion at 315s (~47.5% under the 10-minute target) — closing the High-impact debt item opened at Sprint 2 close, while honestly logging a new, narrower Medium-impact file-size risk at the 1,000,000-record ceiling rather than overclaiming full closure. Batches 2-4 (CSV Integration chain, 10 points): loaded CSV headers into the desktop app, bound a dynamic text field to a real column, and added rebind-without-repositioning — all live-verified against the real built .exe. 223/223 tests passing (up from 195).
2026-09-22 4 - Sprint review product-owner verified all 4 Sprint 3 stories against acceptance criteria (verdict: sprint goal met in full, no gaps). Updated backlog/backlog.md's epic status table and added a “Sprint 3 Review outcome” section; added an independent confirmation note to the throughput story in backlog/epics/05_cli_rendering_engine_and_debenu_integration.md. Confirmed the new file-size technical debt item as open-but-non-blocking; unblocked “Collapse blank optional address lines” for Sprint 4.
2026-09-22 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-3-retrospective.md). Confirmed full follow-through on all four Sprint 2 retro action items, the second clean full-follow-through sprint in a row — notably, the Sprint 2-named test-count arithmetic watch item did not recur. Named a new team strength (“verify spec/code before building,” caught a stale token-format assumption pre-implementation) and logged one low-severity, first-occurrence process watch item (product-owner's Sprint 3 review leaning on dev-team's pre-written verification notes for 3 of 4 stories) to logs/process_improvement_log.md rather than the sprint plan, per the kit/team-insight split — no kit edit made, revisit at Sprint 4 review. Checked all five named anti-patterns (including the Sprint 1 status-theater near-miss); none found.
2026-09-22 1 - Backlog refinement Mid-refinement, the user requested a new text/dynamic-field rotation capability. product-owner clarified scope directly with the user (angle range, UI interaction, pivot point), then wrote and readied two new dependent stories in backlog/epics/02_template_designer_gui_foundation.md (reopened from Done): “Set a rotation angle for text and dynamic field elements” (8 pts) and “Rotate elements by dragging a handle on the canvas” (5 pts). dev-team sized both with real code/vendor-API inspection (confirmed Debenu's DrawRotatedText rotates about an anchor point, not a center, so the center-pivot math is genuine new work). Both pass the Definition of Ready.
2026-09-28 2 - Sprint planning scrum-master facilitated Sprint 4 planning. Velocity range tightened to 18-20 points (Sprint 3 completed its exact 18-point commitment, zero scope change). Committed 18 points at the low end of the range rather than the ceiling: “Collapse blank optional address lines consistently” (5 pts, completes epic 3) plus the full rotation chain (8 + 5 pts, epic 2). “Harden production configuration delivery” (2 pts) deliberately left as an explicit stretch item. Recorded in backlog/sprints/sprint-4.md.
2026-09-28 to 2026-09-29 3 - Sprint execution dev-team completed all 3 committed batches in dependency order. Batch 1 (blank-line collapse, 5 points): new AddressLineCollapser row-height-shift geometry, collapsible XML attribute, and a dashed-orange canvas highlight distinguishing an unmapped column from a merely-blank one. Batch 2 (rotation angle property, 8 points): empirically confirmed against the real Debenu DLL that positive angle is counterclockwise, built RotatedTextAnchorCalculator for bounding-box-center pivot math, proved it with a pixel-ink-centroid regression test. Batch 3 (drag-to-rotate handle, 5 points): reused Batch 2's panel/canvas sync plumbing exactly as its sizing note predicted; live-verified with real Win32 mouse-drag input, saved-XML value matched the drag to full floating-point precision. 288/288 tests passing (up from 223). One honestly-reported testing-tooling glitch (not a product defect), correctly not logged as debt.
2026-09-29 4 - Sprint review product-owner verified all 3 Sprint 4 stories against acceptance criteria (verdict: sprint goal met in full). Updated backlog/backlog.md's epic status table and added a “Sprint 4 Review outcome” section; wrote independent confirmation notes for all 3 stories (dev-team was deliberately kept from pre-writing epic verification content this sprint). Both the Template Designer GUI Foundation and CSV Integration and Field Mapping epics are now Done outright.
2026-09-29 1 - Backlog refinement Ahead of closing Sprint 4, the user requested requirements for a new composite “Address Control” element (grouped lines mixing static text and CSV fields, single-anchor placement). product-owner gathered requirements across two rounds of clarifying questions and recorded a new epic, backlog/epics/08_composite_address_controls.md (2 dependent stories), deliberately left unsized per the user's own framing of “get requirements” before closing the sprint.
2026-09-29 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-4-retrospective.md). Confirmed full follow-through on all four Sprint 3 retro action items, the third clean full-follow-through sprint in a row — notably, the Sprint 3-named PO-review-independence watch item resolved structurally (dev-team was kept from writing epic verification content; product-owner wrote all 3 stories’ notes fresh and independently) and was closed out in logs/process_improvement_log.md rather than carried forward. Named a new positive signal (a sizing note's specific reuse claim was later confirmed exactly by the real implementation). No kit edits. Checked all anti-patterns including the PO-review-independence watch item explicitly; none found.
2026-09-29 1 - Backlog refinement dev-team sized epic 08's two stories with real code inspection: 13 points each (a new size ceiling for this team, previously 8). Story 1 (“Mix static text and CSV fields”) is a breaking model change to TextElementLayout with no existing UI to build from. Story 2 (“Group lines into a single, movable Address Control”) is the designer's first composite element kind; a deliberate sizing-time design call (single anchor, auto-spaced lines, not N independently-moved children) means the existing AddressLineCollapser grouping logic needs no changes. Both pass the Definition of Ready and are marked Ready, but product-owner recommends committing them to separate sprints given their combined 26-point size against 18-20 point velocity.
2026-10-05 2 - Sprint planning scrum-master facilitated Sprint 5 planning. Velocity range holds at 18-20 points (four data points: 20, 19, 18, 18). Committed 15 points, deliberately below the low end of the range given “Mix static text and CSV fields within a single text element”‘s (13 pts) size and structural risk: plus “Harden production configuration delivery for CLI runtime settings” (2 pts). “Group lines into a single, movable Address Control” (13 pts) left uncommitted per dev-team's own sizing-note recommendation against combining both epic-08 stories in one sprint. Recorded in backlog/sprints/sprint-5.md.
2026-10-05 3 - Sprint execution dev-team completed both committed batches (survived one transient background-agent API/network failure mid-run, resumed cleanly with no work lost). Batch 1 (mixed static/field text content, 13 points): replaced TextElementLayout/TemplateElement's exclusive StaticText/ColumnName with an ordered Runs list, keeping the old properties as computed back-compat projections so all 233 pre-existing tests passed unmodified. Proved backward compatibility by building the actual pre-Sprint-5 CLI binary from a git worktree and byte-comparing real output, controlling for Debenu's own internal nondeterminism. Batch 2 (production configuration hardening, 2 points): decided to keep the existing license-key mechanism unchanged, documented in CLI_CONTRACT.md. 330/330 tests passing (up from 288). One live-caught GUI bug fixed same-pass; one disclosed bracket-syntax editing limitation documented as an accepted trade-off.
2026-10-09 4 - Sprint review product-owner verified both Sprint 5 stories against acceptance criteria (verdict: sprint goal met in full). Updated backlog/backlog.md's epic status table (correcting a stale story count for epic 05 along the way) and added a “Sprint 5 Review outcome” section; independently confirmed dev-team's production-configuration decision rather than rubber-stamping it, flagging it to the user as a licensing/deployment judgment call. The CLI Rendering Engine and Debenu Integration epic is now Done outright.
2026-10-09 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-5-retrospective.md). Confirmed full follow-through on all three Sprint 4 retro action items, the fourth clean full-follow-through sprint in a row, one exceeded (backward-compatibility verification via a real historical-binary byte-comparison). Named a new action item: GUI verification automation reliability has now had two distinct issues in two consecutive sprints, worth hardening before Sprint 6's likely GUI-heavy Address Control story. No kit edits — both findings judged team/tooling-level, not Scrum-kit-level. Checked all anti-patterns including PO-review independence; none found.
2026-10-09 1 - Backlog refinement User reported rotated dynamic/mixed-content fields rendering at inconsistent positions per record. product-owner confirmed the root cause by code inspection (bounding-box-center pivot depends on each record's own resolved-text width; canvas preview doesn't reflect this either, breaking the rotation story's own already-shipped canvas/render-parity AC) before writing anything down. Logged as Open/High-impact in logs/technical_debt_log.md and written up as a full story in backlog/epics/02_template_designer_gui_foundation.md, not yet sized. Recommended for high priority in whatever's planned next, pending human product-owner confirmation.
2026-10-12 1 - Backlog refinement dev-team sized “Keep rotated dynamic and mixed-content fields positioned consistently across records” at 5 points after code inspection (DebenuPdfRenderer, RotatedTextAnchorCalculator, TemplateCanvasControl, CanvasElementEditor, RenderEngine). Story now passes Definition of Ready: clear ACs, no blocking dependency, plausible single-sprint scope. product-owner prioritized it first for Sprint 6 because it fixes already-shipped print-output correctness and canvas/render parity.
2026-10-12 2 - Sprint planning scrum-master facilitated Sprint 6 planning after the user confirmed the post-retro pause point with “continue.” Committed 18 points: the 5-point rotation-positioning defect first, then “Group lines into a single, movable Address Control” (13 pts). Recorded in backlog/sprints/sprint-6.md. Sprint 5 retrospective action carried in explicitly: harden GUI verification automation reliability before/during the Address Control story.
2026-10-12 3 - Sprint execution (in progress) dev-team completed Sprint 6 Batch 1, “Keep rotated dynamic and mixed-content fields positioned consistently across records” (5 pts). Chose the fixed authored (x, y) anchor as the canonical pivot for rotated dynamic/mixed content, leaving rotated static text on the existing center-pivot path. Updated CLI rendering, desktop canvas geometry, tests, docs, sprint notes, and the technical debt log. Verified with 336/336 tests, a real-DLL transform-anchor regression, a real 392-record CLI render of the rotated dynamic sample template, desktop build, and a WinForms canvas bitmap smoke. Sprint remains active with Batch 2 next.
2026-10-12 3 - Sprint execution dev-team completed Sprint 6 Batch 2, “Group lines into a single, movable Address Control” (13 pts), bringing Sprint 6 to 18/18 points Done. Added a new Address Control model on desktop and CLI, line-list UI, per-line mixed-content editing and default-on collapse, whole-control move/resize including a right-edge canvas handle, <addressControl> XML persistence, CLI parse/render expansion, and template-format docs. Verified with 349/349 tests, clean desktop build, a real 392-record CLI render from a temp Address Control template, an actual WinForms canvas bitmap smoke, and a full TemplateDesignerForm bitmap smoke that caught and fixed a dock-order bug hiding the properties panel.
2026-10-12 4 - Sprint review product-owner verified both Sprint 6 stories against acceptance criteria (verdict: sprint goal met in full). The rotated dynamic/mixed-content defect fix is accepted and the 2026-10-09 High-impact technical debt item remains resolved. The Composite Address Controls and Mixed-Content Text epic is now Done outright. No new backlog item required; two scope notes remain documented, not defects: Address Control width does not wrap/clip render text, and whole-control rotation remains out of scope.
2026-10-12 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-6-retrospective.md). Confirmed the fifth clean full-follow-through sprint in a row. Main action for Sprint 7: use actual built-form smokes for GUI stories that touch form layout/properties/toolbar actions. No kit-level edit proposed.
2026-10-16 1 - Backlog refinement product-owner ran Sprint 7 backlog refinement. Found epic 4's “Ready” label stale (unchanged since onboarding, predating rotation/mixed-content/Address Controls) - real code inspection showed the canvas preview never resolves per-record text at all, just raw bracket tokens. Rewrote and re-sized both stories: “Render an accurate, record-specific preview of the current template” (8 pts, up from 5) and “Jump to a specific record number” (5 pts, up from 3), both now Ready with ACs requiring one shared text-resolution routine (avoiding a third divergent implementation, the same drift class behind the 2026-10-09 rotation defect) and a built-form smoke. A third epic-4 story, “Warn on text overflow before render,” was left explicitly Not Ready - no element has any bounding-width concept today, logged as an open question for the human product owner, not blocking Sprint 7. Also converted epic 6's three placeholder one-liners into full sized stories: “Select multiple elements at once on the canvas” (5 pts, new prerequisite story, no multi-select exists), “Align and distribute multiple elements” (5 pts, depends on the former), “Snap elements to grid and guides” (5 pts), “Undo and redo layout changes” (13 pts, flagged as this backlog's highest-uncertainty estimate - no undo/redo infrastructure exists at all). Confirmed the two open impediments (asset path strategy, UNC timeout/retry) remain non-blocking since epic 7 stays behind epic 6. No backlog reordering - findings changed sizing/scope, not relative priority. Full reasoning in backlog/backlog.md's “Sprint 7 backlog refinement outcome (2026-10-16)” note.
2026-10-19 2 - Sprint planning scrum-master facilitated Sprint 7 planning. Velocity now has six data points (20, 19, 18, 18, 15, 18) - a stable 18-20 range. Committed 18 points: the full epic 4 pair (“Render an accurate, record-specific preview,” 8 pts; “Jump to a specific record number,” 5 pts, dependent) plus “Snap elements to grid and guides” (epic 6, 5 pts, no dependencies) - chosen over the other epic 6 candidates as the lowest-risk way to round out capacity (no CLI/XML surface, canvas-only smoke needed). Deliberately kept “Select multiple elements” and “Align and distribute” (10 pts combined, hard-dependent) out rather than splitting the prerequisite across sprints. Left “Undo and redo layout changes” (13 pts, this backlog's highest-uncertainty estimate) out entirely, recommending a short feasibility check before it's ever committed. Recorded in backlog/sprints/sprint-7.md; planning outcome note added to backlog/backlog.md.
2026-10-19 3 - Sprint execution dev-team completed all 3 committed batches (18/18 points). Batch 1 (record-specific preview, 8 pts): extracted a single shared TextResolver and RotationPivotCalculator (replacing two near-duplicate implementations each), built a framework-free TemplatePreviewBuilder/PreviewTextDraw mirroring RenderEngine, and a dedicated TemplatePreviewControl wired into TemplateDesignerForm via a deterministic TableLayoutPanel (avoiding a repeat of Sprint 6's dock-order bug). Live-verified via a real built-.exe reflection harness: rotated dynamic pivot stayed fixed across differently-sized names, Address Control collapse worked against real data. One new Low-impact tech debt logged (Address Control lines visually overlap at small font sizes - pre-existing GDI+ measurement approximation, doesn't affect the real PDF render path). Batch 2 (jump to record, 5 pts): new CsvRecordNavigator mirroring the CLI's proven CsvRecordSource pattern; live-verified navigating the real 392-record sample CSV including an out-of-range case. Batch 3 (grid/guide snapping, 5 pts): new GridSnapper wired into both CanvasElementEditor and TemplateCanvasControl; live-verified with a canvas-only smoke confirming mid-gesture snapping. 400/400 tests passing (up from 349).
2026-10-19 4 - Sprint review product-owner verified all 3 Sprint 7 stories against acceptance criteria by reading the actual new/changed code and test files (not just dev-team's summary) - confirmed the shared TextResolver/RotationPivotCalculator are genuinely used by canvas and preview alike, the preview auto-refreshes on every real edit path, collapse/mixed-content/Address-Control scenarios in TemplatePreviewBuilderTests genuinely mirror RenderEngineTests, record navigation is a real unbounded scan (not the 20-row preview cap), and grid snapping is continuous mid-drag with zero template-format changes. Verdict: sprint goal met in full. Lacking shell/build access this session, substituted an independent [Fact]/[Theory] count (matched 400/400 exactly) and code-level checks for a live dotnet test run and built-.exe re-verification - disclosed explicitly rather than presented as full re-verification. I (top-level session) ran dotnet test directly afterward and confirmed 400/400 (299 Desktop + 101 CLI) for real. Updated backlog/backlog.md's epic table and Sprint 7 Review outcome note, epics 04/06 with verification detail, and added a PO confirmation to the new Low-impact Address Control overlap tech debt entry (confirmed root cause confined to GDI+ canvas/preview measurement, doesn't touch the real PDF render path).
2026-10-19 5 - Sprint retrospective scrum-master ran the retrospective (backlog/sprints/sprint-7-retrospective.md). Sixth consecutive clean full-follow-through sprint: all three Sprint 6 carry-ins held (built-form smoke rule applied correctly - canvas-only smoke for the canvas-only grid-snap story was correct per the rule's own original wording, not a shortcut, though one minor nuance was named: Batch 2 reused Batch 1's full-form screenshot rather than capturing a fresh one after adding a new toolbar control; product-risk-first ordering confirmed; cross-layer code-inspection sizing confirmed via cited real method/class names in the 2026-10-16 sizing notes). New “Watching” item logged in logs/process_improvement_log.md (not a kit edit): this sprint's PO review lacked shell/build access and substituted a static test-attribute count plus code reading for a live dotnet test run - judged a first-occurrence tooling-access gap, explicitly distinct from the closed Sprint 3 PO-independence item, not severe enough for a kit change. No anti-patterns found. Three concrete action items carried into Sprint 8 planning (see Next action above).