Product Backlog

Index of all epics, ordered by priority (top = highest priority). Each epic is its own file under backlog/epics/.

Order Epic File Status
1 End-to-End Text Rendering Slice epics/01_end_to_end_text_rendering_slice.md In Progress (2 of 3 stories Done — Sprint 1)
2 Template Designer GUI Foundation epics/02_template_designer_gui_foundation.md Done (4 of 4 stories — Sprint 2)
3 CSV Integration and Field Mapping epics/03_csv_integration_and_field_mapping.md Ready
4 CLI Rendering Engine and Debenu Integration epics/05_cli_rendering_engine_and_debenu_integration.md In Progress (4 of 7 stories Done — Sprint 1-2)
5 Live Preview and Record Navigation epics/04_live_preview_and_record_navigation.md Ready
6 Layout Efficiency and Operator Tooling epics/06_layout_efficiency_and_operator_tooling.md Not Started
7 Dynamic and Network Image Handling epics/07_dynamic_and_network_image_handling.md Not Started

Notes

  • Prioritization favors the requirements document's recommended vertical slicing: deliver a text-only end-to-end workflow first, then layer images, shapes, and operator-efficiency tooling.
  • The CLI/rendering epic now sits ahead of preview in the ordered backlog because it is a direct dependency for the first demonstrable PDF-generating slice.
  • The top five epics now contain sprint-ready stories for the first one to two sprints of MVP work.
  • Open requirement questions that may affect ordering: path strategy for template assets and timeout behavior for slow UNC shares.

Sprint 1 Review outcome (2026-09-11)

  • Sprint 1's 5 committed stories are Done; verification detail and any caveats are recorded story-by-story in backlog/epics/01_end_to_end_text_rendering_slice.md and backlog/epics/05_cli_rendering_engine_and_debenu_integration.md. Full summary: backlog/sprints/sprint-1.md (Sprint Review Outcome section).
  • Recommend pulling “Time-box the first high-volume benchmark” (epics/05, 5 points, Ready) early in Sprint 2 refinement/planning alongside whatever else is pulled from epics 2-3 — it's a cheap, high-information risk check that's now overdue (not re-run since Sprint 1 Batch 2) rather than a reason to reorder the epic list itself.
  • New stories added from this review: “Harden production configuration delivery for CLI runtime settings” (epics/05) and “Surface real warning counts in progress and completion reporting” (epics/07). Neither is urgent for Sprint 2's likely candidates (epics 2-3 touch neither CLI configuration nor warnings).
  • The two open impediments (template asset path strategy; UNC timeout/retry behavior, both in logs/impediment_log.md) do not block Sprint 2's likely candidate epics (2 and 3) — neither of those epics’ stories touch images or network asset paths. They only need to be resolved before epic 7 (Dynamic and Network Image Handling) stories are pulled into a sprint; recommend deciding them during backlog refinement once epic 7 nears the top of the backlog, per “delay firm decisions to the last responsible moment,” rather than treating them as urgent now.

Sprint 2 Review outcome (2026-09-18)

  • Sprint 2's 5 committed stories (the full Template Designer GUI Foundation epic plus the high-volume benchmark spike, 19 points) are Done; verification detail is recorded story-by-story in backlog/epics/02_template_designer_gui_foundation.md and backlog/epics/05_cli_rendering_engine_and_debenu_integration.md. Full summary: backlog/sprints/sprint-2.md (Sprint Review Outcome section).
  • Material finding, not a defect in this sprint's delivery: the benchmark spike found the render path badly misses the product's “100,000 records at 300 DPI in under 10 minutes” hard constraint — throughput degrades from ~399 rec/s to ~15 rec/s and falling at realistic scale, projecting 45-90+ minutes for a full 100k run (5x-10x+ over target), most likely due to Debenu Quick PDF Library 10.13's own document model rather than this repo's code. Full data: code/BENCHMARK.md. Strong recommendation: prioritize the new “Investigate and address high-volume render throughput degradation” story (epics/05, Ready, not yet sized) at or near the top of Sprint 3, ahead of or alongside CSV Integration — this is a High-impact item that directly threatens a hard product constraint (project_config.md) and gets worse, not better, the longer higher-volume-dependent feature work (CSV integration at scale, eventual 1M-record ceiling) is built on top of an unfixed render path.
  • The stretch item (“Load CSV headers and sample rows into the desktop app,” epic 3) was not pulled in Sprint 2; it remains the natural first CSV Integration story for Sprint 3.
  • No changes to the two open impediments (template path strategy; UNC timeout/retry) — still non-blocking for Sprint 3's likely candidates (CSV Integration and the throughput investigation touch neither template image paths nor network shares).